Tianxi kitchen electric MES phase II startup
Time:2021-09-18 05:17:06
Since October 2020, our company has reached initial cooperation with Tianxi kitchen power phase I MES system project. After close cooperation between the project team and various departments of Tianxi, phase I system was successfully launched in May 2021. Phase I includes MES systems of 13 production lines.
In August 2021, the A1 plant of Tianxi's new plant was officially put into trial production. After the start of phase II MES system cooperated by Hongzhi and Tianxi, it immediately entered the project investigation stage.
Department managers of A1 new plant participated in the project kick-off meeting
MES phase II project will change the traditional production mode, realize the control of important links such as production process control, quality statistics and traceability, material error prevention and stupidity prevention through product and material bar codes, transparent production order information and improve the overall quality level of products.
With the launch of MES phase II project, it indicates that Hongzhi and Tianxi have reached a deep and close cooperative relationship. Hongzhi team has the confidence and ability to complete the development and online work of the project on schedule, jointly participate in the construction of Tianxi digital chemical plant, and help Tianxi achieve the goal of "International first-class kitchen power supplier".
Conduct detailed demand research with IE department, planning department, storage department, quality department, equipment department, informatization and other departments.
Hongzhi is willing to empower the digital information construction of manufacturing enterprises with professional technology, first-class quality and perfect service.